Safety 1st Advancer Manual do Operador Página 100

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 132
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 99
Environmental Remediation Drilling
Safety Guideline
Page 100 of 132
5.10.1 - Potential Hazards of Well Development
Pinch points
Tool lengths
Moving cables
Contaminated fluids
Acids and polyphosphates
Electricity
Noise
Pressurized lines
5.11 - Surface Completion
Prior to well surface completion the following should be considered:
Type of completion - flush mount, above grade, locking
Bollard location and clearances
5.11.1 - Potential Hazards of Surface Completion:
Traffic control
Mixing concrete
Heavy vaults and boxes
Striking underground utilities
Vault settlement - trip hazard, surface water intrusion
5.12 - Abandoning Wells
Prior to well abandonment the following should be considered:
Rig mobilization and rig up - from Section 4 – Drilling Operations
Method
o Over drill
o Abandon in place
5.12.1 - Potential Hazards of Over Drill
All previous sections of the guideline apply.
Vista de página 99
1 2 ... 95 96 97 98 99 100 101 102 103 104 105 ... 131 132

Comentários a estes Manuais

Sem comentários