Environmental Remediation Drilling
Safety Guideline
Page 110 of 132
JOB SAFETY ANALYSIS FORM
JOB TITLE/TASK: Drilling/Boring and Associated Soil Sampling
PROJECT ID PROJECT MANAGER:
DATE: REVISION: HEALTH/SAFETY DIRECTOR:
RECOMMENDED PERSONAL PROTECTIVE EQUIPMENT (PPE): _X_ Safety Glasses w/ Sideshields _X_ Steel-toed Boots
_X_
Hard Hat _X_ Nitrile Gloves _X_ Leather Work Gloves _X_ Other __Hearing protection and High Visibility Vest ___X____
JOB STEP
POTENTIAL
HAZARDS
PREVENTATIVE/CORRECTIVE ACTION
APPLIES TO
PROJECT
(Y/N)
and Other
Overhead
Obstacles
Use a spotter when raising mast to confirm clearance of overhead lines and
other obstructions
Rig Movement Heavy equipment should be equipped with back-up alarm or use horn when
backing - use spotter when available
Stay clear of operating equipment and rig when moving
Heavy
Equipment
Lifting/ Carrying
Use at least 2 people to lift and carry sections, use mechanical lift devices
whenever possible, bend and lift with legs and arms, not back
Sharp or
Elevated
Equipment
Wear appropriate PPE including steel-toed safety boots, leather gloves and
hard hat
Establish communication system between workers involved in
moving/attaching sections
Ground
Disturbance:
Auger/Boring
Advancement
Faulty or
Inappropriate
Equipment
Qualified driller must inspect drill rig prior to use, if faulty or inappropriate,
do not proceed until repaired or replaced
Inspect all hand tools prior to use, if faulty or inappropriate, do not proceed
until repaired or replaced
Moving
Equipment
Clear area of obstructions and communicate with all workers involved that
drilling is beginning
Do not exceed manufacturer's recommended speed, force, torque, or other
specifications. and penetrate the ground slowly with hands on the controls
for at least the first foot of soil to minimize chance of auger kick-out
Stay clear of rotating auger
Use long-handled shovel to clear away cuttings when auger has stopped
Do not wear loose clothing
Wear appropriate PPE including leather gloves and steel-toed boots
Suspended
Loads
Do not walk under suspended loads
When possible, remove overhead hazards promptly
Wear appropriate PPE including hard hat and steel-toed boots
High Noise
Levels
Use hearing protection if within 20 feet of active drill rig
Vapors and
Airborne
Monitor air concentrations using direct-reading, real-time instruments such
as OVM and Draeger tubes