Safety 1st Advancer Manual do Operador Página 45

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 132
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 44
Environmental Remediation Drilling
Safety Guidelines
Page 45 of 132
effects of wind on the power lines and hoist lines of the mast, it is advisable to maintain a 20-foot
clearance.
Post signs on ground level to alert workers to the presence of overhead utilities.
Never raise the mast of the rig without a designated spotter.
Except where electrical distribution and transmission lines have been de-energized and visibly
grounded at point of work or where insulating barriers, not a part of or an attachment to the
equipment or machinery, have been erected to prevent physical contact with the lines, equipment or
machines shall be operated proximate to power lines only in accordance with the following per 29
CFR 1926.550(ii):
o For lines rated 50 kV or below, minimum clearance between the lines and any part of the
crane or load shall be 10 feet,
o For lines rated over 50 kV, minimum clearance between the lines and any part of the crane or
load shall be 10 feet plus 0.4 inch for each 1 kV over 50 kV, or twice the length of the line
insulator, but never less than 10 feet,
o In transit with no load and boom lowered, the equipment clearance shall be a minimum of 4
feet for voltages less than 50 kV, and 10 feet for voltages over 50 kV, up to and including
345 kV, and 16 feet for voltages up to and including 750 kV.
Unless a more conservative spacing requirement is stipulated by state or local regulations, use the
following table as minimum spacing guidance:
TABLE 4.1 - Spacing Guidelines for Electrical Service
Nominal Voltage
(Phase to Phase)
Minimum Required
Clearance (feet)
50,000 10
Over 50,000 to 75,000 11
Over 75,000 to 125,000 13
over 125,000 to 175,000 15
over 175,000 to 250,000 17
over 250,000 to 370,000 21
over 370,000 to 550,000 27
over 550,000 to 1,000,000 42
Adapted from Code of Safe Drilling Practices, California Dept. of Transportation,
Division of Engineering Services, Revised April 30, 2004
Because of the difficulty in estimating distances from the ground and the effects of wind on the
power lines and hoist lines of the mast, it is advisable to maintain at least a 20-foot clearance.
Confirm with the power company that overhead power lines have been de-energized prior to drilling.
Never drive the drill rig from hole to hole with the mast in the raised or partially raised position.
If contact between rig and power line occurs:
Assume the entire rig to be electrified. Do not attempt to enter or leave the rig or touch any part of it.
Although people in the rig may not be affected, anybody touching the rig while in contact with the
ground is in danger of being electrocuted.
Have someone call the power company and the local fire rescue squad immediately for assistance.
Vista de página 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 131 132

Comentários a estes Manuais

Sem comentários