Environmental Remediation Drilling
Safety Guidelines
Page 25 of 132
2.6.5 - Vibrocator cont.
Figure 2.5 - A Vibrocator Being Demonstrated in a Non-environmental Remediation Work Area.
(Photo courtesy of Enviroscan, Inc.)
There are two limitations of this technology. One is that all non-metallic pipes to be traced must be available
for connection directly to the transmitter. The second is that excessive energy imparted to the pipe may
cause damage to the pipe.
2.7 - Training Workers for Borehole Clearing Tasks
The following are considered to be minimum levels of training for individuals performing the tasks
associated with clearing a borehole:
40-Hour OSHA HAZWOPER training (required for HAZWOPER sites).
Some level of internal training and prior drilling experience regarding safe locations in which to drill.
Specific drilling tasks may require more experience and training for the:
Individual who makes the decision that the location is acceptable to drill,
Quality Assurance (QA) Point Person.
A senior-level project team member should consult with the field personnel during the final location of the